Stage 3 of the Frankston Redevelopment Plan commenced in August 2024 and includes the establishment of the new Frankston Tech School. This space will be hosted by Chisholm and develop partnerships with local industry, community and secondary schools, and is scheduled for completion in Term 3 2025.

Tech Schools are a dynamic, empowering environment where students can take on real-world problems and design their own solutions.

The contemporary, single storey building will focus on delivering hands-on, immersive STEAM (Science, Technology, Engineering, Art and Math) learning experiences outside the classroom for secondary school students in the surrounding local government areas.

Frankston Tech School will have a fully enclosed floor area of nearly 1000 square metres and host up to 95 students in this purpose built, flexible and tech-filled space. Programs will be developed with ongoing input from local schools, communities and industries.